Installation Step Indoor trampoline park
INSTALLATION TEAM |
1. Dream garden playground installation team consists of 50+ professional engineers. 2. Engineers with years of experience have installed projects worldwide. 3. Engineers are capable of dealing with problems at installation site. |
PROFESSIONAL DRAWINGS |
1. Dream garden playground engineer team offers professional drawing for installation. 2. The drawings make it possible for clients to install on their own. 3. The drawings will help improve the efficiency of park installation. |
AFTERSALES ASSISTANCE |
1. After sales team to keep following up with the installation progress. 2. After sales negotiate with engineers to solve installation problems. 3. Keep following up with client and offer maintenance advice. |
Step 1
Install all the trampoline frames inside (including ninja steel frames and other steel frames) Can be installed from any one corner
Step 2
Install fence frames
Step 3
Install the safety net, the protection Tube+ clamp/zip and cover PVC leather surrounding(blue line)
Step 4
Install all soft items with boards,electric game needs power
Fix the balance beam on the frame with screws in the right position
Step 5
Install Wooden floor
(Need to be cut on site as required size,we sent enough pieces of wood board)
Step 7
Install trampoline padding and passageway floor mat
Step 9
Make sure all 3 stairs on the right position
All the posts covered by soft padding
Put on bumperballs and basketballs and dodge-balls
Step 10
Clean up the site, try the mat one by one and check all the equipments again.
Installation Manual
Indoor Playground
1. Put on the flooring mat
2. Install columns, horizontal pipes, and items that must be installed together with horizontal pipes
1) connect the numbered column with the corresponding horizontal pipe (Refer to installation drawing)
Note: a. Install yellow foot plate under each landing column first;
b. Small items that must be installed with horizontal pipes, such as Roller barrier,mace,etc,
c. Adjust the position of suspension fasteners
2) large equipment (FRP slide, plastic sliding barrel, stainless steel slide, up &down net platform)
3.Install all the slides
(Devil slide,FRP slide,Donut slide)
4. Install the protection net
1) First fix protection net on the top horizontal tube with yellow rope, and use coiling method (make a knot at a distance of 50cm)
Step 10 Clean up the site, try the mat one by one and check all the equipments again.